Central Railway will operate Special Power and Traffic block for commissioning of Electronic Interlocking at Thansit station in connection with Kalyan-Kasara 3rd line work on 16/17 August 2025(Saturday/Sunday mid-night).
The block will be operated from 00.30 am of Saturday/Sunday mid-night to 05.15 am (early morning of Sunday.
Due to the block, several mail and express and suburban trains will pass with caution and authority, and may be delayed.
Affected Suburban Trains
The CSMT–Kasara local departing CSMT at 10:47 PM on 16th August 2025, and at 12:08 AM on 17th August 2025, might be delayed.
Similarly, the Kasara–CSMT locals departing Kasara at 3:51 AM and 4:59 AM on 17th August 2025 might also be delayed.
Affected Long Distance Down Trains
Train no 12141 LTT-Patliputra Express,
Train no 11057 CSMT-Amritsar Express,
Train no 12811 LTT-Hatia Express,
Train no 22177 CSMT-Varanasi Mahanagri Express,
Train no 22538 LTT-Gorakhpur Kushinagar Express,
Affected Long Distance Up Trains
Train no 18030 Shalimar-LTT Express,
Train no 12810 Howrah-CSMT Mail,
Train no 20104 Azamgarh-LTT Superfast Express,
Train no 11002 Ballarshah - CSMT Nandigram Express
Train no 12152 Shalimar-LTT Samarsata Express and
Train no 12112 Amravati- CSMT Superfast Express
Regulation of UP Mail/Express Trains
Train no 12106 Gondia-CSMT Vidarbha Express will be regulated by 40 minutes
Train no 17058 Lingampalli-CSMT Devgiri Express will be regulated by 15 minutes.
Train no 12618 Hazrat Nizamuddin-Ernakulam Mangala Lakshwadweep Express and
Train no 12138 Firozpur-CSMT Punjab Mail will be delayed by 15 to 20 minutes.
According to an official, these infrastructure blocks are carried out in the larger interest of the passengers and the Nation. Passengers are requested to bear with the Railway Administration for the inconvenience caused.