Mumbai: The south-side staircase of the old footover bridge (FoB) at the south end of Andheri railway station will be closed from Jan 17. “Construction work of a 4-meter-wide skywalk from the new south-end FoB to the old south-end FoB at Andheri station, which will connect to the deck, is in progress. In connection with this, the south staircase of the old south FoB on Platform No 2 / 3 is to be dismantled,” a WR official said, adding that the staircase will remain closed for 4 months, from Jan 17 to May 16, 2023.
Mumbai: Old south-end Foot Over Break at Andheri railway station to be partially closed
The south-side staircase of the old footover bridge (FoB) at the south end of Andheri railway station will be closed from Jan 17.
RECENT STORIES
Mumbai Metro-3 Aqua Line: Shiv Sena (UBT) Workers Booked For Protest Over 'Kotak' Name On CSMT Metro...

Mumbai Crime Branch Busts Illegal Pushpa Restaurant And Bar In Tardeo; ₹7.46 Lakh Seized, 56...

Maharashtra CM Fadnavis Defends Ministers Amid Row Over Controversial Remarks, Threats And Rummy...

Mumbai News: BMC Shuts Dadar Kabutar Khana; Jain Community Alleges Pigeon Deaths Due To Starvation

Thane News: Labourer Electrocuted at Bhiwandi Construction Site, FIR Filed Against Contractor
