PM Modi To Dedicate Nation's First 9000 HP Locomotive Engine At Gujarat's Dahod

PM Modi To Dedicate Nation's First 9000 HP Locomotive Engine At Gujarat's Dahod

The railway factory in Dahod, established under the PPP model, is set to manufacture 1,200 engines over the next 10 years, with plans to export them both domestically and internationally. These locomotive engines will soon be produced entirely under the 100% Make in India initiative.

ANIUpdated: Wednesday, May 21, 2025, 04:02 PM IST
article-image
PM Modi To Dedicate Nation's First 9000 HP Locomotive Engine At Gujarat's Dahod | PTI

Gandhinagar (Gujarat): Following Operation Sindoor, Prime Minister Narendra Modi is visiting his home state, Gujarat, for the first time. He will participate in events across three districts--Dahod, Kachchh and Gandhinagar--on May 26 and 27.

After addressing a public meeting on Mirzapar Road in Bhuj, Kachchh, he will pay a visit to the revered Mata Ashapura Temple. Notably, the Prime Minister will inaugurate the first 9000 HP locomotive engine manufactured at the railway production unit established in Dahod, which was built with an investment of Rs 20,000 crore.

The railway factory in Dahod, established under the PPP model, is set to manufacture 1,200 engines over the next 10 years, with plans to export them both domestically and internationally. These locomotive engines will soon be produced entirely under the 100% Make in India initiative.

A key feature of these engines is their ability to carry cargo weighing up to 4,600 tonnes. For the first time, the engines will be equipped with air conditioning and a toilet facility for the driver. Additionally, an advanced cover system has been installed to enhance safety and prevent accidents. Built at a cost of Rs 20,000 crore, the Dahod factory is currently producing four engines, all of which will proudly bear the label "Manufactured In Dahod."

This project is expected to generate direct and indirect employment for nearly 10,000 people in Dahod and nearby regions, providing a significant boost to the local economy. In addition, the various components required for locomotive production by the multinational company that secured the contract as the lowest bidder will open up business opportunities for suppliers in the power sector as well as small and medium-sized engineering firms.

Notably, the 9000 HP, 6-axle electric engine will have an average speed of 75 km per hour. Maintenance of this engine will be carried out at depots in Kharagpur (West Bengal), Visakhapatnam (Andhra Pradesh), Raipur (Chhattisgarh), and Pune (Maharashtra).

(Except for the headline, this article has not been edited by FPJ's editorial team and is auto-generated from an agency feed.)

RECENT STORIES

From Slab Collapse To Uprooted Trees: Dust Storm, Rain And Hail Lash Delhi; Metro, Flights Affected...

From Slab Collapse To Uprooted Trees: Dust Storm, Rain And Hail Lash Delhi; Metro, Flights Affected...

UP Govt Launches Plantation Mahabhiyan-2025 To Plant 4.12 Crore Saplings Along 13 Major Rivers

UP Govt Launches Plantation Mahabhiyan-2025 To Plant 4.12 Crore Saplings Along 13 Major Rivers

UP CM Yogi Adityanath Orders Audit Of Divyang Institutions, Emphasizes Student Safety & Dignity

UP CM Yogi Adityanath Orders Audit Of Divyang Institutions, Emphasizes Student Safety & Dignity

UP CM Yogi Adityanath Reviews COVID-19 Preparedness In High-Level Meeting Amid Rise In JN.1 Cases In...

UP CM Yogi Adityanath Reviews COVID-19 Preparedness In High-Level Meeting Amid Rise In JN.1 Cases In...

Gujarat: Mumbai Man Held For Wife’s Murder In Ahmedabad, Nabbed Within An Hour Of Alert

Gujarat: Mumbai Man Held For Wife’s Murder In Ahmedabad, Nabbed Within An Hour Of Alert