Mumbai-Ahmedabad Bullet Train Project: 210-Meter-Long Bridge Completed Over NH-48 In Gujarat's Navsari; (Video)
The newly completed bridge is the second PSC box-segmental bridge constructed over NH-48 using the Balanced Cantilever method. It comprises 72 precast segments and spans four sections with configurations of 40m + 65m + 65m + 40m.

Mumbai-Ahmedabad Bullet Train Project: 210-Meter-Long Bridge Completed Over NH-48 In Gujarat's Navsari |
Mumbai: A significant milestone in the Mumbai-Ahmedabad Bullet Train Project was achieved on October 1, 2024, with the completion of a 210-meter-long PSC (Prestressed Concrete) bridge over National Highway 48 (NH-48) at Sisodra village in Navsari district, Gujarat. This bridge is a crucial part of the bullet train corridor, which will revolutionize high-speed rail travel between Mumbai and Ahmedabad.
The newly completed bridge is the second PSC box-segmental bridge constructed over NH-48 using the Balanced Cantilever method. It comprises 72 precast segments and spans four sections with configurations of 40m + 65m + 65m + 40m. Strategically located between the Billimora and Surat Bullet Train stations, the bridge ensures uninterrupted connectivity along the bullet train’s elevated viaduct.
ALSO READ
Challenges Ahead Of Construction Of Bridge
NH-48, one of India's busiest highways, posed a unique challenge due to heavy traffic flow. The construction team managed to complete the launching of the bridge over the highway with meticulous planning, ensuring safety and precision throughout the process.
"This bridge marks a significant step forward in the Mumbai-Ahmedabad High-Speed Rail Corridor, which promises to transform regional travel between Maharashtra and Gujarat," said an official of National High Speed Rail Corporation.
RECENT STORIES
-
Daily Horoscope For Monday, September 22, 2025, For All Zodiac Signs By Astrologer Vinayak Vishwas... -
Indore: SAF Constable Bitten By Snake At The Battalion, Dies -
DGP Orders To Secure Police Properties Across MP; Police To Protect Hundreds Of Acres Of Unused Land... -
Two Arrested In Indore For Duping, Robbing Jewellery Showroom Employee -
Support The Noble Cause Of Indore, Say No To Car On Monday To Ease Traffic And Lower Air Pollution