Bhopal: 100 MCFT Water Released From Upper Lake
BMC assistant engineer Ajay Solanki said, “At 10.20 am, gate no 5 was opened and it was closed at 6 pm.
Staff Reporter
Updated: Tuesday, September 26, 2023, 01:11 AM IST

Bhopal (Madhya Pradesh): About 100 million cubic feet (MCFT) of water was released from Upper Lake with opening of Bhadbhada dam gate no 5 on Monday. Upper Lake’s Full Tank Level (FTL) is 1,666.8 feet.
BMC assistant engineer Ajay Solanki said, “At 10.20 am, gate no 5 was opened and it was closed at 6 pm. 100 MCFT water was released from Upper Lake.” Earlier, two gates of Bhadbhada dam were opened after water level increased to 8 feet in Kolans River following heavy rainfall in Sehore district. It led to rise in Upper Lake’s water level.
ALSO READ
MP Election 2023: Ex-CM Digvijaya Singh Jibes At PM Modi's Visit To Bhopal, Says BJP Is Scared
RECENT STORIES
-
Maharashtra Minister Bharat Gogawale Holds High-Level Meeting On MGNREGA Reforms, Welfare Demands... -
Indore Scam: EOW Raids IMC Official For Disproportionate Assets; Accused Of Assets Over 12 Times His... -
Rough Landing Of Saudi Airlines Haj Flight In Lucknow Sparks Panic, DGCA Orders Probe -
Mumbai News: MMRCL To Reconstruct Girgaon Road Stretch That Caved In; BMC Finds No Utility Leak -
UP News: Light Rainfall Brings Relief To Barabanki’s Masauli Region, Boosts Paddy Sowing Prospects